    2,055,424 files checkedFiles from Modrinth and CurseForge we downloaded and checked. Counted on 25 Oct 2026.636,163 files with their code readFiles whose code we turned back into readable code and read, in an isolated environment. Counted on 25 Oct 2026.269,392 projects gradedProjects with a letter from A to F. Counted on 25 Oct 2026.
    How it worksMalware we foundAPIAboutPrivacyTermsContact

    © 2026 ModgradeNot an official Minecraft product. Not approved by or associated with Mojang or Microsoft.

    FW Paint

    Mod

    Client first mod, paint block gradients and 3D-noise fills from your inventory.

    B82/ 100
    • OverviewB
    • SecurityPassed
    • PrivacyNone found
    • AIStated by the author
    • CompatibilityUp to 26.3
    • ModpacksIn none
    • ReleasesLatest 18 Oct

    Download

    fw-paint-fabric-2.4.1.jar

    Released 18 Oct 2026 · 416.7 KB

    Passed: our checks found nothing harmful in this file.

    Download

    Required to run

    • Fabric APIAMinecraft 26.3 · Fabric (release 0.165.0)
    OverviewSecurityPrivacyAICompatibilityModpacksReleases

    Why grade B

    How grades work

    Strengths

    • Security checks passed
    • Regular releases for the newest Minecraft versions
    • Stable releases
    • Public source code

    Points lost

    • First release only 4 months ago−6 points
    • Under 5 million downloads−2 points
    All 11 criteria
    • Maintenance

      Full points21 / 21
      Last releaseHow long ago the newest file came out, or an existing file was marked as working on a new Minecraft version.7 days ago (18 Oct 2026) 12 / 12
      Supports popular versionsWhether the project has a file for a Minecraft version that 15% or more of the popular mods updated in the last 6 months also support. A version many modpacks use, like 1.20.1 or 1.21.1, also counts after a release in the last 12 months.26.3 on Fabric and NeoForge (latest) 9 / 9
      Regular releasesIn how many of the last 24 months a new file came out. Full points at 8 months.Does not apply. The project is under 6 months old.
    • Stability

      Full points5 / 5
      Removed from modpacksHow many modpacks removed it in a later version of the pack. We can only see this in modpacks with two or more versions. A pack that swaps it for another edition of the same project, or that is rebuilt from scratch, does not count.Not measured yet.
      Quick fixesHow often a release needed a quick fix: a new release within 3 days to fix a problem in it.Does not apply. The project is under 6 months old.
      Known conflictsHow many projects say they do not work with it, compared with how widely it is used. Packs, small projects, forks, ports, add-ons, alternatives and old versions do not count.None 5 / 5
    • Transparency

      Full points7 / 7
      Source codeWhether the project page links to its source code, so anyone can read what it does.GitHub · nullabork/fw-paint-fabric 7 / 7
      Place to report problemsWhether the project page links to a place where players can report problems: an issue tracker.Does not apply. CurseForge links are not in our data.
    • Popularity

      2 points lost2 / 4
      DownloadsDownloads on Modrinth and CurseForge. Full points from 5 million.560 2 / 4
    • Track record

      6 points lost2 / 8
      AgeHow long the project has existed. It counts less when no new file came out recently.4 months, 31 releases 2 / 8
    • Security

      Passed
      File checksThis check adds no points. It can only take points away.Our checks found nothing harmful in all 4 latest files for recent Minecraft versions. See Security
    Total82 / 100

    37.1 of the 45 points that apply = 82 out of 100. The points above are rounded to whole numbers.

    Images

    • selector-wheel-solid-block-picker-v2.2.0.jpg
    • marker-line-tube-gradient-fill-v2.4.0.jpg
    • marker-line-square-tube-controls-v2.4.0.jpg
    • pattern-editor-variation-shimmer-preview-v2.1.0-beta.1.jpg
    • palette-editor-segment-strip-previews-v2.0.0-beta.1.jpg
    • gradient-vs-noise-same-palette-walls-v2.0.0-beta.1.jpg
    • help-tab-topic-index-v2.0.0-beta.1.jpg
    • settings-tab-missing-blocks-toggle-v2.0.0-beta.1.jpg
    • paint-tab-quick-controls-v2.0.0-beta.1.jpg
    • solid-tab-big-preview-selected-v2.0.0-beta.1.jpg
    • finder-tab-pure-color-marker-v2.0.0-beta.1.jpg
    • palette-tab-list-states-v2.0.0-beta.1.jpg
    • pattern-wall-placed-variation-v2.1.0-beta.1.jpg
    • pattern-editor-expanded-preview-v2.1.0-beta.1.jpg
    • noise-wall-inside-circle-marker-v2.2.0.jpg
    • marker-circle-donut-band-v2.2.0.jpg
    • marker-square-rotated-ring-v2.2.0.jpg
    • selector-wheel-place-shape-markers-v2.2.0.jpg
    • selector-wheel-paint-types-v2.2.0.jpg
    • marker-line-bare-s-curve-topdown-v2.4.0.jpg

    In-game changes

    Does not change the game's code directly.

    Adds 6 key bindings: Line: lock drag to an axis (hold while dragging), Clear connected markers (hold + click), Cycle active palette, Line: mirror handles / link both ends (hold while dragging), Open FW Paint screen and Quick selector.

    Counted from the names and data files in the mod, so the list may not be complete.

    Keeps all of vanilla Minecraft's textures, models and sounds.

    Details

    Creator
    faxwang
    License
    Not known
    Downloads
    560
    Created
    1 Jul 2026
    Official page
    CurseForge
    Links
    Source code

    Security

    No harmful code found

    We checked its files and read their code, without running it.

    What it can do on your computer

    Creates settings files
    The mod keeps its settings in the config folder of your game, where you can change or delete them. 2 files in your config folder.

    Why we show this: a mod runs on your computer like any program, so harmful code in it can take your accounts or files. Our checks look for known signs of harm. They cannot prove that a file is harmless. In the grade: malware means no grade, and a Warning in a latest file for a recent Minecraft version lowers it.

    How we checked · All 4 latest files checked, last on 21 Oct 2026
    • FilesWe download the files from Modrinth or CurseForge and look at what is inside them and what their code can do, without running them. Fixed rules tell what is harmful.
      4 latest files: the newest file for each Minecraft version and loader. All 4 are for recent versions. Recent versions: those released in the last 2 years, plus 1.20.1 and 1.21.1, among the most played in modpacks. See each file in Releases
    • Their codeWe turn the code of the files back into readable code and follow what it does, without running it. This shows what it downloads, what it sends and where your login goes.
      Read without running it
    • Looked for, not foundWe looked for these in the file and did not find them.
      The internet, folders outside the game, other programs, updating itself, the webcam or microphone, an AI service.

    Privacy

    We found nothing it sends

    We read its code without running it: it contacts no web address while you play.

    Why we show this: a mod can send things about you over the internet, like your player name or your login. Contacting an address to check for updates or download files sends nothing about you. Not in the grade: sending data can be normal for what a mod does.

    How we checked · All 4 files read
    • Files readWe read the code without running it. We list each web address the code contacts while you play, and what it sends. Code that is never used is left out.
      The code of all 4 files, for recent Minecraft versions. See each file in Releases

    AI

    AI was used to make it

    The author writes that AI was used.

    We looked for AI tools in its texts, files and images and found none.

    We have not read its code history yet.

    No sign of AI in the game

    We found no AI service, AI library or AI model file in its code.

    Why we show this: some players and servers avoid projects made with AI, and AI in the game can send what you write to an online service. Not in the grade: using AI does not tell whether a project works well or is kept up to date.

    How we checked · 4 places read
    • Author on ModrinthThe disclosure form on Modrinth. Since 13 Aug 2026, Modrinth's rules require it when a substantial part of the code is AI output, when an asset is mainly AI output, or when the project or its page relies on generative AI.
      Not on Modrinth.
    • Code historyThe public code on GitHub: who made each change, credit lines such as "Co-authored-by", and its files.
      Not read yet
    • Description and changelogsThe description, project page and newest changelogs: sentences saying an AI tool was used, and text pasted from an AI chat.
      Found
      38 of 40 changelogs read
    • Its filesFiles that AI coding tools leave behind (like AGENTS.md), and the texts inside the files you download.
      Nothing found
    • Images in its filesHidden data in the images of the files you download, where AI image tools write their name and settings.
      Nothing found
      3 images read
    • Code of the modThe code and files of the mod, read without running it: addresses of AI services, AI libraries, AI model files and a place for your own AI key.
      No AI service, AI library or AI model file
      145 code files read

    Compatibility

    See all 31 files
    Fabric
    NeoForge
    26.226.3

    Point at or tap a version to see its loaders.

    RequiresProjects you must also install for it to work. From the author's lists for its files for recent Minecraft versions, or from its project page.
    Fabric APIin some filesA
    OptionalProjects it can work with but does not need. The author lists them.Nothing
    IncludesProjects packed inside its files.Nothing
    Speed of updatesHow fast it gets a file for new Minecraft versions, on average, compared with similar projects. Not part of the grade.It got a file 1 day after Minecraft 26.3 came out.

    Modpacks using this project

    No known modpack uses it.

    Latest files

    The newest file for each Minecraft version and loader. The files for recent versions come first. Recent versions: those released in the last 2 years, plus 1.20.1 and 1.21.1, among the most played in modpacks.

    MinecraftLoaderVersionSecuritySendsRequires
    26.3·Fabric2.4.12.4.1 · fw-paint-fabric-2.4.1.jarSends: None foundRequires:Fabric APIPassedOur checks found nothing harmful in this file. Its code was read too.
    26.3·NeoForge2.4.12.4.1 · fw-paint-neoforge-2.4.1.jarSends: None foundRequires:NothingPassedOur checks found nothing harmful in this file. Its code was read too.
    26.2·Fabric2.3.02.3.0 · fw-paint-fabric-2.3.0.jarSends: None foundRequires:NothingPassedOur checks found nothing harmful in this file. Its code was read too.
    26.2·NeoForge2.3.02.3.0 · fw-paint-neoforge-2.3.0.jarSends: None foundRequires:NothingPassedOur checks found nothing harmful in this file. Its code was read too.

    31 releases

    MinecraftLoaderVersionReleasedSecurityGet it onDownload
    26.3The latest file for its Minecraft version and loader·NeoForge2.4.12.4.1 · fw-paint-neoforge-2.4.1.jar·18 Oct 2026PassedOur checks found nothing harmful in this file. Its code was read too.Open this file on CurseForgeDownload · Stable · 413.5 KB
    26.3The latest file for its Minecraft version and loader·Fabric2.4.12.4.1 · fw-paint-fabric-2.4.1.jar·18 Oct 2026PassedOur checks found nothing harmful in this file. Its code was read too.Open this file on CurseForgeDownload · Stable · 416.7 KB
    26.3·Fabric2.4.02.4.0 · fw-paint-fabric-2.4.0.jar·13 Oct 2026PassedOur checks found nothing harmful in this file. Its code was read too.Open this file on CurseForgeDownload · Stable · 412.2 KB
    26.3·NeoForge2.4.02.4.0 · fw-paint-neoforge-2.4.0.jar·13 Oct 2026PassedOur checks found nothing harmful in this file. Its code was read too.Open this file on CurseForgeDownload · Stable · 409.0 KB
    26.3·NeoForge2.3.32.3.3 · fw-paint-neoforge-2.3.3.jar·4 Oct 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 347.9 KB
    26.3·Fabric2.3.32.3.3 · fw-paint-fabric-2.3.3.jar·4 Oct 2026PassedOur checks found nothing harmful in this file. Its code was read too.Open this file on CurseForgeDownload · Stable · 350.8 KB
    26.3·Fabric2.3.22.3.2 · fw-paint-fabric-2.3.2.jar·3 Oct 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 350.3 KB
    26.3·NeoForge2.3.22.3.2 · fw-paint-neoforge-2.3.2.jar·3 Oct 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 347.4 KB
    26.3·NeoForge2.3.12.3.1 · fw-paint-neoforge-2.3.1.jar·17 Sep 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 347.3 KB
    26.3·Fabric2.3.12.3.1 · fw-paint-fabric-2.3.1.jar·17 Sep 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 350.2 KB
    26.2The latest file for its Minecraft version and loader·NeoForge2.3.02.3.0 · fw-paint-neoforge-2.3.0.jar·16 Aug 2026PassedOur checks found nothing harmful in this file. Its code was read too.Open this file on CurseForgeDownload · Stable · 346.8 KB
    26.2The latest file for its Minecraft version and loader·Fabric2.3.02.3.0 · fw-paint-fabric-2.3.0.jar·16 Aug 2026PassedOur checks found nothing harmful in this file. Its code was read too.Open this file on CurseForgeDownload · Stable · 349.7 KB
    26.2·Fabric2.2.02.2.0 · fw-paint-fabric-2.2.0.jar·15 Aug 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 346.5 KB
    26.2·NeoForge2.2.02.2.0 · fw-paint-neoforge-2.2.0.jar·15 Aug 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 343.6 KB
    26.2·NeoForge2.1.0-beta.12.1.0-beta.1 · fw-paint-neoforge-2.1.0-beta.1.jar·30 Jul 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 284.2 KB
    26.2·Fabric2.1.0-beta.12.1.0-beta.1 · fw-paint-fabric-2.1.0-beta.1.jar·30 Jul 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 286.6 KB
    26.2·Fabric2.0.0-beta.12.0.0-beta.1 · fw-paint-fabric-2.0.0-beta.1.jar·26 Jul 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 237.8 KB
    26.2·NeoForge2.0.0-beta.12.0.0-beta.1 · fw-paint-neoforge-2.0.0-beta.1.jar·26 Jul 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 235.8 KB
    26.2·NeoForge1.5.01.5.0 · fw-paint-neoforge-1.5.0.jar·22 Jul 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 187.3 KB
    26.2·Fabric1.5.01.5.0 · fw-paint-fabric-1.5.0.jar·22 Jul 2026PassedOur checks found nothing harmful in this file.Open this file on CurseForgeDownload · Stable · 189.0 KB