Skip to content
BrowseScan your modsScan

    No project matches this search.

    2,046,932 files checkedFiles from Modrinth and CurseForge we downloaded and checked. Counted on 24 Oct 2026.636,163 files with their code readFiles whose code we turned back into readable code and read, in an isolated environment. Counted on 24 Oct 2026.269,480 projects gradedProjects with a letter from A to F. Counted on 24 Oct 2026.
    How it worksMalware we foundAPIAboutPrivacyTermsContact

    © 2026 ModgradeNot an official Minecraft product. Not approved by or associated with Mojang or Microsoft.

    AnotherBackroomsProject

    Resource pack

    A realistic backrooms resource pack with shaders using posteffect command.

    C72/ 100
    • OverviewC
    • SecurityPassed
    • PrivacyNothing sent
    • AINone found
    • CompatibilityNo version listed
    • ModpacksIn none
    • ReleasesLatest 17 Jul

    Download

    AnotherBackroomsProject.zip

    Released 17 Jul 2026 · 8.4 MB

    Passed: our checks found nothing harmful in this file.

    Download
    OverviewSecurityPrivacyAICompatibilityModpacksReleases

    Why grade C

    How grades work

    Strengths

    • Regular releases
    • Stable releases

    Points lost

    • First release only 3 months ago−6 points
    • Under 500,000 downloads−2 points
    All 10 criteria
    • Maintenance

      Full points12 / 12
      Last releaseHow long ago the newest file came out, or an existing file was marked as working on a new Minecraft version.3 months ago (17 Jul 2026) 12 / 12
      Supports popular versionsWhether the project has a file for a Minecraft version that 15% or more of the popular mods updated in the last 6 months also support. A version many modpacks use, like 1.20.1 or 1.21.1, also counts after a release in the last 12 months.Not measured yet.
      Regular releasesIn how many of the last 24 months a new file came out. Full points at 3 months.Does not apply. The project is under 6 months old.
    • Stability

      Full points5 / 5
      Removed from modpacksHow many modpacks removed it in a later version of the pack. We can only see this in modpacks with two or more versions. A pack that swaps it for another edition of the same project, or that is rebuilt from scratch, does not count.Not measured yet.
      Quick fixesHow often a release needed a quick fix: a new release within 3 days to fix a problem in it.Not measured yet.
      Known conflictsHow many projects say they do not work with it, compared with how widely it is used. Packs, small projects, forks, ports, add-ons, alternatives and old versions do not count.None 5 / 5
    • Transparency

      Does not apply. A resource pack's files can be read in the download. Not counted for resource packs.
      Source codeWhether the project page links to its source code, so anyone can read what it does.Does not apply.
      Place to report problemsWhether the project page links to a place where players can report problems: an issue tracker.Does not apply.
    • Popularity

      2 points lost2 / 4
      DownloadsDownloads on Modrinth and CurseForge. Full points from 500,000.356 2 / 4
    • Track record

      6 points lost2 / 8
      AgeHow long the project has existed. It counts less when no new file came out recently.3 months, 2 releases 2 / 8
    Total72 / 100

    20.9 of the 29 points that apply = 72 out of 100. The points above are rounded to whole numbers.

    Images

    • Crafting table
    • ???
    • Me :)

    In-game changes

    Changes 7 block textures, 1 item texture (Test), 14 interface textures, 9 models and 16 core shader files.

    Has no files in OptiFine's formats or for other mods.

    Block textures are mostly 1185 by 1185 pixels, up to 2048 by 2048.

    Details

    Creator
    Niblan
    License
    All rights reserved
    Downloads
    356
    Created
    17 Jul 2026
    Official page
    Modrinth

    Security

    No harmful code found

    It has no file for a recent Minecraft version. This is about its files.

    We checked what is inside its files, without opening them in the game.

    Why we show this: a resource pack cannot run programs, but its file can hide one. Our checks look for known signs of harm. They cannot prove that a file is harmless. In the grade: malware means no grade.

    How we checked · The latest file checked, last on 17 Oct 2026
    • FilesWe download the files from Modrinth or CurseForge and look at what is inside them and what their code can do, without running them. Fixed rules tell what is harmful.
      1 latest file. It is not for a recent Minecraft version, so the answer above is about it. Recent versions: those released in the last 2 years, plus 1.20.1 and 1.21.1, among the most played in modpacks. See each file in Releases
    • Author on ModrinthThe disclosure form on Modrinth, where the author declares that the project reads or edits things on your system outside the game. Since 13 Aug 2026, Modrinth's rules require it when this applies.
      Nothing declared about your system outside the game.

    Privacy

    Sends nothing

    A resource pack has no code that can connect to the internet, so it cannot send anything about you.

    AI

    No sign that AI was used to make it

    We looked for AI tools in its texts, files and images and found none.

    Why we show this: some players and servers avoid projects made with AI. Not in the grade: using AI does not tell whether a project works well or is kept up to date.

    How we checked · 4 places read
    • Author on ModrinthThe disclosure form on Modrinth. Since 13 Aug 2026, Modrinth's rules require it when a substantial part of the code is AI output, when an asset is mainly AI output, or when the project or its page relies on generative AI.
      No AI content declared.
    • Description and changelogsThe description, project page and newest changelogs: sentences saying an AI tool was used, and text pasted from an AI chat.
      Nothing found
      2 changelogs read
    • Its filesFiles that AI coding tools leave behind (like AGENTS.md), and the texts inside the files you download.
      Nothing found
    • Images in its filesHidden data in the images of the files you download, where AI image tools write their name and settings.
      Nothing found
      23 images read

    Compatibility

    See all 2 files

    No Minecraft release version is listed for this project.

    Runs onWhere to install it: in your game, on the server, or both. As the author says on Modrinth.Install it in your game only. Servers do not need it, so you can join any server.
    RequiresResource packs cannot list requirements on Modrinth or CurseForge.None declared. Check the pack's description.
    OptionalProjects it can work with but does not need. The author lists them.Nothing
    IncludesProjects packed inside its files.Nothing

    Modpacks using this project

    No known modpack uses it.

    Latest files

    The newest file for each Minecraft version and loader. None is for a recent Minecraft version. Recent versions: those released in the last 2 years, plus 1.20.1 and 1.21.1, among the most played in modpacks.

    MinecraftVersionSecurityRequires
    Older Minecraft versions
    *1.011.01 · AnotherBackroomsProject.zipRequires:NothingPassedOur checks found nothing harmful in this file.

    2 releases

    MinecraftVersionReleasedSecurityGet it onDownload
    26.3-snapshot-3 to 26.3-snapshot-426.3-snapshot-3 to 26.3-snapshot-4The latest file for its Minecraft version and loader1.011.01 · AnotherBackroomsProject.zip (main file)·17 Jul 2026PassedOur checks found nothing harmful in this file.Open this file on ModrinthDownload · Stable · 8.4 MB
    26.3-snapshot-3 to 26.3-snapshot-426.3-snapshot-3 to 26.3-snapshot-41.01.0 · AnotherBackroomsProject.zip (main file)·17 Jul 2026PassedOur checks found nothing harmful in this file.Open this file on ModrinthDownload · Stable · 8.4 MB